HISTORIC REVIEW & DESIGN EVOLUTION / NASHVILLE

Retain the character. Refine the possibilities.

Historic home addition

Addition approved with conditions · 2019–2020

Earlier and revised design studies show how a historic-home addition developed through a preservation-focused review process.

WorkHistoric addition
Earlier designNovember 2019
Revised designJune 2020
MilestoneConditional approval
Revised architectural study with a garage, low connection and historic house
Architecture: S. Mitchell Hodge, AIA · June 4, 2020. Archived design study, not a verified stamped approval set.

JESSICA’S ROLE

Connect the details.
Move the work forward.

Jessica supported the later addition proposal through written comments and participation in the Metro Historic Zoning Commission hearing. The project connected preservation, architectural design, and the public review process.

The documented milestone

On June 17, 2020, the Commission unanimously approved the rear-addition and attached-garage proposal with conditions. The design retained the historic house. This verified approval is separate from the earlier staff recommendation and is not evidence of completed construction.

THE PROJECT PATH

01 / November 26, 2019

Study a rear addition

Earlier drawings by Axis Creative, LLC show a substantial rear addition to the retained house.

02 / December 18, 2019

Receive a staff recommendation

The staff report recommended approval with conditions. A staff recommendation is not the final Commission decision, and this earlier addition study is not identified as a denied design.

03 / June 4, 2020

Refine the architectural direction

The revised S. Mitchell Hodge study changes the addition massing, garage, and lower connection. These excerpts show the design evolution in the archived drawings.

04 / June 17, 2020

Support the revised proposal through review

Jessica submitted written support and called into the hearing. The Commission approved the addition and garage with further staff review of windows and doors, roof shingle color, and utility locations.

Records & project context

Anonymized project history based on archived plans, a staff report, and the June 17, 2020 Commission minutes. The earlier and revised drawings have different architectural authors, credited above. The archives contain an unresolved address-label discrepancy, so the excerpts are not presented as a verified stamped approval set. A separate 2018 full-demolition denial preceded these addition studies; it does not establish that the earlier addition design shown here was denied. No Council bill has been verified for this project.

Source: dated drawings and project correspondence retained in the Smart Girl Developments project archive.

Case study reviewed October 28, 2026. Past project outcomes do not guarantee a future approval or result.

Discuss a similar property ↗

LET’S DEVELOP.

Have a property with a complicated question?

A property address helps. A good question is enough to begin.

Start with Jessica ↗