BZA & ENTITLEMENTS / EAST NASHVILLE

A new direction for an existing triplex.

601 South 11th Street

BZA appeal granted · 2024

Development strategy, revised-plan coordination, and a return to the Board of Zoning Appeals for an existing three-unit property.

Public caseBZA 2024-040
DecisionGranted · 5–0
Decision dateJuly 18, 2024
ProposalThree residential units
Front elevation from the July 17, 2024 revised 601 South 11th Street drawing set
Drawings: Lynn & Associates. Project strategy and BZA coordination: Jessica Williams / Smart Girl Developments.

JESSICA’S ROLE

Connect the details.
Move the work forward.

Jessica coordinated the development approach with the client and drawing team, reviewed earlier BZA feedback, organized the hearing preparation, and submitted the revised plans to Metro Codes.

The documented milestone

Metro’s July 18, 2024 results record BZA case 2024-040 as GRANTED, 5–0, for an appeal seeking to construct a triplex.

FROM THE PROJECT ARCHIVE

The idea, refined.

Compare an earlier front-elevation option with the revised front elevation submitted for the July hearing.

April 16, 2024 front elevation option 3 from the earlier drawing set
Earlier set · April 15–16, 2024Front elevation option 3. Open the image to inspect.
July 17, 2024 revised front elevation
Revised set · July 17, 2024Submitted to Codes on July 18 before the granted appeal.

Drawings © Lynn & Associates. Jessica’s documented role was development strategy and revised-plan/BZA coordination. These excerpts are not a sealed permit set or a final construction record.

THE PROJECT PATH

01 / April 15–16, 2024

Earlier drawing set

The project archive contains an earlier five-sheet set with alternate front elevations and the existing floor plan.

02 / May–July 2024

Review, refine, prepare

Jessica reviewed BZA feedback, met with the client and drawing team, coordinated with Metropolitan Zoning Administrator Joey Hargis, and organized the next hearing submission.

03 / July 17–18, 2024

Revised plans and a granted appeal

The revised five-sheet set was dated July 17 and sent by Jessica to Codes for the July 18 presentation. The public hearing results record a unanimous grant.

Records & project context

The verified milestone is the BZA appeal. This is not a claim of final construction, occupancy, or recorded HPR status. Drawing excerpts are project-history illustrations, not construction documents.

Case study reviewed October 28, 2026. Past project outcomes do not guarantee a future approval or result.